AJMAN CENTER
CASE STUDY
Facility details
• Member since March 2014
• Architectural Structure: G+1 (Commercial)
• Key assets:
5 Package Units
64 Ducted Split Units
Monthly Energy Savings
The chart below shows the actual kWh consumption plotted
against expected kWh and the monthly percentage savings
achieved after the implementation of Energy Conservation
Measures.
Emirates Energy Star (EES) team surveyed the building and proposed to provide real time remote
monitoring and control of the HVAC equipment from Pacific Controls 24x7 Global Command
Control Center with objective of optimizing energy consumption in the building and hence
reduce electricity bill.