Method of operation: Pre and Post Energy Conservation Measure
The graphs below shows the weekly energy profle before and after the implementation of Energy Conservation Measures.
Overall Performance Summary
Summary of benefits obtained
1. Unnecessary running hours reduced, increase in equipment life and decrease in the equipment life cycle cost
2. Reduction in the cooling demand and energy consumption of the building
3. Continuous savings achieved as measured by the comparison from base year energy consumption
4. Real savings of up to 26% achieved