Khalifa City Women's College
CASE STUDY
Facility details
• Member since May 2013
• Architectural Structure:
G+3F (University)
• Total built up area of 436,735 sq ft
• Key assets:
39 Air Handling Units
3 Secondary Pumps
44 Exhaust Fans
Emirates Energy Star (EES) team surveyed the building and proposed to provide real time remote
monitoring and control of the HVAC equipment from Pacific Controls 24x7 Global Command
Control Center with objective of optimizing energy consumption in the building and hence
reduce electricity bill.
Monthly Energy Savings
The chart below shows the actual kWh consumption
plotted against expected kWh and the monthly percentage
savings achieved after the implementation of Energy
Conservation Measures.