DUBAI MUNICIPALITY - AL TWAR CENTER
CASE STUDY
Facility details
• Member since June 2012
• Architectural Structure: G+1 (Commercial)
• Total built up area of 59,202 sq. ft.
• Key assets:
2 Carrier chillers
3 Primary pumps
28 AHU
2 FAHU
Monthly Energy Savings
The chart below shows the actual kWh consumption plotted
against expected kWh and the monthly percentage savings
achieved after the implementation of Energy Conservation
Measures.
Emirates Energy Star (EES) team surveyed the building and proposed to provide real time remote
monitoring and control of the HVAC equipment from Pacific Controls 24x7 Global Command
Control Center with objective of optimizing energy consumption in the building and hence
reduce electricity bill.