Dubai Electricity and Water Authority
CASE STUDY
Facility details
• Member since January 2010
• Architectural Structure: G+4 (Commercial)
• Total built up area of 40,000 sq. ft.
• Key assets:
3 Carrier chillers
4 Primary pumps
2 FAHU
Monthly Energy Savings
The chart below shows the actual kWh consumption plotted
against expected kWh and the monthly percentage savings
achieved after the implementation of Energy Conservation
Measures.
Pacific Controls team surveyed the building and proposed to provide real time remote
monitoring and control of Chiller plant and fresh air handling unit from Pacific Controls
24x7 Global Command Control Center with objective of optimizing energy consumption in the
building and hence reduce electricity bill.